lbw PolB jumps apr15

08apr15


    Projects a2703 reported baseline problems with lbw polB on 07apr15 .  I looked at the following data:
The first plot shows the total power vs time for a2703 data (.ps) (.pdf)
The 2nd plots shows the total power vs time for the a2940 data on 07apr15 (.ps) (.pdf)

On 08apr15 we used the interim correlator to monitor the lbw total power while the techs wiggled the lband wide rf cables
Setup:
The plots show the total power vs time during the wiggle test (.ps) (.pdf)

Summary:

processing: 150407/bc_lbwpolb.pro, 150408/lbwpolb.pro



home_~phil