023Feb17:hf test

03mar17

background
what we did
plots of output and drive
record and plot the tx monitor port outputs
clp movies
Summary


Background:


What we did:


Plots of output and drive power:

The plots show the data we took while the hf was on (.ps) (.pdf)


Plotting the monitor port outputs

    The monitor ports for the 6 tx were recorded with the textronix scope and then plotted. The data showed:



clp movie during hf test

     The 430 clp data from the carriage was processed and  a movies were made. They showed how often arcing appeared.

links to the movies:

Setup:

Movie results:

Summary:

processing: x101/170223/hf_17023.pro


<- page up

home_~phil