PntErrors, sysperf after platform painting

25apr16


Intro  top

      The telescope was shutdown 16feb16 to 21apr16 to finish the painting of the azimuth arm. X102 calibration runs were run on 21apr16 (sbn) and 22apr16(lbw) to check the pointing and system performance after the shutdown.


21apr16: sbn calibration run results (.ps) (.pdf)

22apr16: lbw calibration run results (.ps) (.pdf)

SUMMARY:

processing: x101/160422/x101.pro



page up
home ~phil