mar11: Pointing errors in  800 rcvr

14mar11




    The 800 MHz antenna was reinstalled in sep10. Calibration scans from sept10, jan11, mar11 were used to check the pointing offsets. During this time period the platform reinforcement was also taking place. The important dates are:
    The plots show the 800 MHz pointing error for the sep10 thru 11mar11 timeframe (.ps) (.pdf):
    The table below shows the mean and rms errors from the various datasets:

date
za error (asecs)
az Error (asecs)
mean
rms
mean
rms
26sep10
-21.76
3.02
.31
2.18
20jan11
-24.35
5.49
1.86
5.58
9-11mar11
-25.69
5.13
5.13
7.19
20jan-11mar
 -25.43
3.60
 4.49
7.00

The same sources were tracked 10mar11 and then 11mar11 (after the feed bolts were tightened) to see if the pointing had changed.

 The plots show the difference in pointing errors for the two days (.ps) (.pdf):


Summary:

processing: x101/110311/pnterr800.pro,pnterr_tightenbolts.pro

page up
home ~phil