jun15: calibration runs after lbw reinstalled in dome

jun2015

    Lbw was brought down to the lab in may15 to work on the window. It was reinstalled in the dome on 05jun15. Data was taken using the x102 calibration runs to see if things were ok.
    Data was taken:
    On the 13 jun15 run i changed the frequencies that the x102 calibration was using:
The plots show the results of the run (.ps) (.pdf)

processing: x101/150611/lbwx102.pro