sbn system performance for venus run:may20

23may20


The results:


    x102 calibration runs were done on 10,18, and 22 may20 using the sbn receiver. Sources were selected to be close to the declination of Venus during the may20 campaign (26 to 23 deg). The runs were done from about 18:00 to 03:00.

    The plots show the system performance and the pointing error (.ps) (.pdf)

Comments:


processing: x101/200520/sbnx102.pro
home_~phil