sbn calibration after m8-4 cable repair

mar14


Intro

    The 13jan14 earthquake damaged cable m8-4. The repair was finished on 11mar14. X102 calibration runs were done 11 and 12mar14 to see how the pointing and gain were.

The setup

The data


The plots show the results of the measurements (.ps) (.pdf):

Summary:

processing: x101/140311/x102.pro

home_~phil