Tiedown grounding

last updated. 08sep16


    The tiedown cables are the path to ground when lightning hits the towers/platform. To isolate the tiedown equipment we have:

Measuring resistance to ground.

    I measured the resistance to ground from the Huffman box to the vertical aluminum support structure to the right of the phone.


date
td
all connected
(1): motor heater
Unplugged
(2):motorCable1 and (1)
(black power cable)
(3):motor cable2 and (2)
(grey resolver cable)
(4) encoder cable out and  (3)
Notes:
19apr12
12
2 ohms
108 ohms
(inf,70Kohm) (*1)
1.7VDc,6VAc
(inf,200Kohm)
3.4Dc,10VAc
(inf,2Mohm) (*1)
3.6VDc,10VAc
motor power off (emgStop)
Huffman box powered.
ground strap not connected.

Notes:

To do:


Notes:
160907: Before the hf arcing test:


<- page up
home_~phil