Building 2 power shutdown

24jan13

The datataking setup
  xmitting a birdie from building 2 to find the az peak.
The  shutdown sequence
Monitoring with 327 during the power cycling
    dynamic spectra of 327 power cycling
    327 rfi frequencies that turned on,off during the power cycling

Page in Progress (28jan13); The multi frequency data taken after the on or off has not yet been reduced


Intro:

   The power at building 2 was shutdown on 24jan13starting around 17:00 hours. Data was taken with various receivers, before, during, and after the shutdown to investigate rfi coming from this area. Prior to the shutdown birdies were transmitted from building 2 to find the azimuth of the strongest signal.
    The shutdown included: building 2, ac on top of building 2, and the two trailers between building 1 and building 2.

The datataking setup:


The  shutdown sequence: (top)

    • 16:53 327
    • 16:59 lbw
    • 17:02 430
    • 17:07 sbw1
    • 17:11 sbw2
    1. time minutes
      from start
      action
      17:17:53
      0
      start 327 continous monitoring
      17:20:10
      2.3
      start turning off 1st floor
      17:26:15
      8
      1st floor is off
      17:26:55
      9
      start turning off 2nd floor
      17:37:25
      19
      2nd floor is off (as well as trailers)
      17:38:10
      20
      start floor 4 turnoff
      17:38:50
      21
      start floor 3 turnoff
      17:47:35
      29
      floor 3 is off
      17:53:40
      35
      floor 4 is off (ups in phil's office got left on)
      17:55:00
      37.12
      main breaker (and ac breaker) off

    • floors 1,2 and the trailers were left off for the duration.
    1. time minutes
      from start
      action
      18:24:33
      0
      start 327 continuous monitoring
      18:27
      2.45
      turn on main breaker
      18:29
      4.5
      start turning on floors 3 and 4
      18:31
      6.5
      turn on main AC breaker
      18:32:20
      7.5
      AC compressor turns on
      18:40:35
      16
      floor 3 is all on
      18:43:25
      19
      floor 4 is all on



monitoring with 327 during the power cycling (top)

    The dynamic spectra  images show the 327 receiver during the turnoff and then turn back on.
EVENT
34 Mhz band images
(25 Khz resolution)
Image blowups: 6 x 6.2 Mhz images
(4.1 Khz resolution)
1st Turn off
sequence
315 Mhz Band 315:1 Off 315:2 Off 315:3 Off 315:4 Off 315:5 Off 315:6 Off
339 Mhz Band 339:1 Off 339:2 Off 339:3 Off 339:4 Off 339:5 Off 339:6 Off
1st Turn on
sequence
315 Mhz Band 315:1 On 315:2 On 315:3 On 315:4 On 315:5 On 315:6 On
339 Mhz Band 339:1 On 339:2 On 339:3 On 339:4 On 339:5 On 339:6 On
2nd Turn off
sequence
315 Mhz Band 315:1 Off 315:2 Off 315:3 Off 315:4 Off 315:5 Off 315:6 Off
339 Mhz Band 339:1 Off 339:2 Off 339:3 Off 339:4 Off 339:5 Off 339:6 Off
2nd Turn on
sequence
315 Mhz Band
315:1 On 315:2 On 315:3 On 315:4 On 315:5 On 315:6 On
339 Mhz Band 339:1 On 339:2 On 339:3 On 339:4 On 339:5 On 339:6 On

processing: x101/130124/shutdown_327onoff.pro, img327.pro

Plotting the rfi that came and went with the building turn on,offs:

    All of the high resolution 327 images were manually searched for rfi that turned off when the building power was turned off or turned on when the building power was turned back on.

    The plot shows the 327  frequencies that turned on, off with the building power (.ps) (.pdf):

processing: x101/130124/findrfi327.pro

Processing, plotting the data taken with power on or off.

Processing the data:

   The data from the datataking sequence: powerOn,powerOff,powerOn,poweroff,powerOn was processed as:

Plotting the dat, finding the rfi:


The table below shows:


Table of rfi freq from visitor center shutdown
receiver
#numbands
rfi Freq
Mhz
Page
Notes
327 (.pdf) (1 Mbyte)
302-352Mhz
2


only seen in dynamic spectra
327 is very noisy. alfa motor controller was on
lbw (.pdf)  (7 Mbytes)
1120-1750Mhz
14


polA,B.. maybe something weak in Boff?


polA


polA
sbw (.pdf)  (13 MBytes)
1700-1790
2040-2400
2600-3100
24
-
-




Notes on the test: (top)


processing: x101/130124/shutdown_327onoff.pro, siteshutdown.pro, onoff1rcvr.pro,baslin.pro,fitbas.pro


 home_~phil