Pointing Error Checks nov06

28nov06

Sections
Intro
Measurements
Conclusions
Plots
The pointing errors taken on the 4 days (.ps) (.pdf):

Intro  top

The azimuth 1 encoder failed on 14nov06 and had to be reset using the index on the azimuth arm. X102 runs were taken on 16nov06 (lbw) , 23/25nov06 (sbn) , and on 26nov06 (lbw). The results of these pointing measurements are shown below. 

The Measurements   top

The plots show the pointing errors taken on the 4 days (.ps) (.pdf):

Conclusions  top


processing: x101/061123/chkpnt.pro, pntfit.pro


page up
home ~phil