point error after rcvr reinstalled after ao19

sep 2013

 

     The receivers sbw, cband, and cband hi were removed in jul13 for the ao19 installation. These receivers were reinstalled in the dome after ao19  was removed (on 06aug13). x102 calibration runs done 19aug13 thru 31aug13 were used to check the pointing on these receivers after the re installation.
    The table belows show the receivers and number of patterns taken:
   
receiver
number of x102 patterns
sbw
196
sbn
86
cband
414
cband hi
202


    Note the sbn was not removed for the ao19 testing.

The plots show the pointing errors for the 4 receivers taken 19aug13->31aug13 (.ps) (.pdf):
If the receiver was reinstalled i little off, there would be an azimuth or zenith angle offset.
The table summarized the mean and rms offsets for the measurements
rcvr
za errors (asecs)
azimuth errors (asecs)

mean
rms
mean
rms
sbn
1.9
2.9
0.5
6.0
sbw
-8.6
3.7
0.1
5.7
cband
-7.9
3.5
-1.3
5.4
cbandhi
1.4
2.5
1.8
4.6


    sbw and cband have relatively large za offsets.
On 10sep13 i updated the za constant term ( in the  pointing models for sbw, cband) to correct for this error.