Kips per platform inch.
18oct10
The tiedown kips per platform inch was measured
on 18oct10 around 11:00 am. The process was:
Tiedown pos
(inches pulled down)
|
tdKips
tot
|
platform
Hght ft
|
tiedowns=[13,13,13]
|
76.7
|
1256.086
|
tiedowns=[16.4,16.4,16.4]
|
94.2
|
1255.919
|
tiedowns=[13,13,13]
|
76.5
|
1256.085
|
The plot shows these motions (.ps)
(.pdf):
- Top: tension from each of the 3 tiedowns
- center: total tension from the tiedowns
- bottom: platform height for the 3 moves
Summary:
- Pulling the tiedowns 8.8 kips moves the platform 1 inch
- moving the tiedown cables 1.7 inches moves the platform 1 inch.
Notes:
- Putting 8.8 kips on the platform will move the platform down less
than 1 inch:
- the weight moves the platform down
- This releases some of the tension on the platform from the
tiedowns
- The net weight (weight + tiedown tensions) is less than when
just pulling on td cables by 8.8 kips.
- The platform also ends up higher than when just tiedown tension
is increased by 8.8 kips.
processing:
x101/101018/kipsPerInch.pro
<-