lbw cooldown jun08

02jul08
    lbw failed three times between 20jun08 and 01jul08. The crosshead was replaced on each warm.
The plots show the cooldown times for the 16K and omt stages (.ps) (.pdf):
    processing: x101/080702/chklbwtemp.pro


   pageup
 home_~phil