performance check after kevlar cables tensioned, tertiary moved.

10apr04

     The turret floor re enforcing and the kevlar cable tensioning were completed on 08apr04. A quick calib run (transit to set) was done using 3C138 (B0518+165)  using lbw. On 09apr04  the tertiary was resurveyed into position and then a number of sources were tracked rise to set using lbw and sbn.
 
processing: x101/040409/doit.pro