monitor lbw stability 11oct10

11oct10

     the stability of lbw was monitored on 11oct10 using the interim correlator. The setup was:
The plots show the power vs time for the 3 sets of data (.ps) (.pdf)

Discussion:

processing: x101/101011/chklbw.pro



 home_~phil