Cable sag surveys with P50 aug-sept 2020

sept 2020

(cable survey info moved)
 

Scanning the primary

On 01sep20  we scanned part of the dish from the visitor center balcony with the p5 laser scanner. It focused on the portion of the dish
damaged by by auxmain4N cable failure.
The scanner setup was:

Link to .las file   (file size:size: 1.3 GBytes)


 home_~phil