lna polA stage 2 current glitches seen in ips data.




11may20: ips data and lna stage 2 currents (top)

    IPS (InterPlanetaryScintillation) is taking data with the 327 receiver and the mock spectrometer. The processing is:


A movie was made showing the spectra of the total power for the  327 receiver data on 11may20 (.avi)

The plot shows the bias currents for 327 stage 1 and 2 for 11may20 afternoon (.ps) (.pdf)

Summary:

  processing:x101/200512/327glitch.pro

home_~phil